Correct chronological order the necessary water treatment processes
An engineer working in the manufacturing industry and you intend to design and build a water treatment plant to utilize water that will be sourced from a nearby river for the facility’s boiler operations. List down in correct chronological order the necessary water treatment processes that will be incorporated in your design. Define the purpose of, and describe each process. Assume you are hired for a paper manufacturing facility that will be built and you are tasked to come up with a comprehensive management plan that will address all the potential wastes that will be generated. Create a list of essential activities in proper chronological order that you will undertake. Apply the concepts and principles of engineering management and environmental engineering.
If a manufacturing facility generates raw wastewater that is predominantly composed of dissolved and suspended solids and with ThOD of 100 mg/L, which of the following treatment equipment you could do away with?
- Drum screen
- Communitor
- Primary settling tank
- Trickling Filter
- Aeration Tank
- Secondary Settling Tank
- Sludge thickener
- Belt press for sludge dewatering