Work Breakdown Structure

Create a Work Breakdown Structure (WBS) for the following scope: Requirement 1:  3 bedrooms

  1. Requirement 2:  2.5 bathrooms
  2. Requirement 3:  Pool
  3. Requirement 4:  2 patios, one patio should be enclosed

Your WBS should be based upon your chosen Life Cycle Methodology and include any deliverables

APA format 500 words.